Boston Elevated Railroad Project
Project Summary: Demolition, Orange line Track and Structure, Boston, Massachusets
Owner: Metropolitan Bay Transportation Authority
Requested Service: Performance extension analysis, disruption claim formulation, major rapid transit demolition project.
Engagement: Did computerized dismantlement simulation as originally planned, compared with as-built performance. Planned performance was non-existent; nullified by owner caused schedule disruption. Performed engineering estimate of damages. CPM schedule analysis.
Issues: Active interference, superior knowledge, misrepresentation, recovery under quantum meruit
Claim Value: $4MM range