Friant Dam Power Plant Project

Friant DamProject: Friant Dam - Retrofit power plant, development stage, Fresno, California

Owner: US Bureau of Reclamation

Problem: Differing site conditions and defective design for excavation subcontractor at three power house sites at existing dam.

Outcome: Researched and prepared claim for equitable adjustment to establish basis. Work included providing proof of entitlement through schedule analysis and an analysis of cost overruns. Engineering estimates of recoverable costs were packaged into claim for $1.0MM.